Made byBobr AI

Myntra & North Retail IT Performance Report 2025

Explore IT operational excellence, service metrics, and automation initiatives for Myntra's North Retail region, featuring SLA and cost-saving highlights.

#it-performance#operational-excellence#retail-supply-chain#sla-report#warehouse-automation#business-analytics#it-metrics
Watch
Pitch
IT Initiatives & Performance Overview 2025
Myntra & North Retail Region | Operational Excellence Report
Main visual
Made byBobr AI

Performance Metrics Summary

10,582+ Service tickets managed with exceptional SLA adherence.
99.91% Response Rate achieved across operations.
99.97% Resolution Rate for critical IT support.
CSAT: 95.78 | NPS: 94.74 indicating high user satisfaction.
• Guaranteed 100% Asset Availability during Big Billion Days (BBD).
Made byBobr AI

Ticket Volume by Center

Breakdown of 10,582 tickets managed across key fulfillment and distribution centers, highlighting the high volume at Bilaspur FC.

Chart
Made byBobr AI

SLA Performance Dashboard

  • Bilaspur FC: 4,517 tickets with 100% Resolution SLA.
  • North DC Support: Perfect 100% score in both Response & Resolution.
  • Binola IT EUC: 99.89% consistent performance balance.
Made byBobr AI

Automation & Network Enhancements

SCALABLE OPERATIONS:

LMC Automation successfully enabled at Bilaspur & Binola locations.
Botify SSID created significantly for automation tasks.
• Upgraded 180 Access Points to ensure network resilience.
• Bandwidth capacity optimized based on deep-dive Ops consultations.
Futuristic abstract representation of network connectivity, glowing data lines, orange and teal color scheme, high tech server room atmosphere, 3d render, clean style.
Made byBobr AI

Asset Lifecycle Updates (2025)

Successful End-of-Life (EOL) replacements ensuring hardware reliability across the region.

Chart
Made byBobr AI
₹15.5 Lakhs
generated in direct cost savings through proactive repairs and infrastructure optimization.
Made byBobr AI
Workforce Empowerment
Massive scale training initiatives to ensure security and operational efficiency:

9,572 Operations Training Participants (303 Sessions)
1,847 InfoSec Participants (46 Sessions)
Made byBobr AI

Strategic Impact 2025

• Zero Business Disruption
• Chrome OS / Ubuntu Compliance: 80% achieved.
• Peak Performance: Scalability under pressure during EORS sales events.
• Team Morale: High CSAT/NPS scores reflecting a motivated workforce.
Abstract climbing graph arrow, ascending towards success, vibrant pinks and oranges, 3d isometric style, business growth concept, clean background.
Made byBobr AI
Thank You
North IT Region | 2025
Made byBobr AI
Bobr AI

DESIGNER-MADE
PRESENTATION,
GENERATED FROM
YOUR PROMPT

Create your own professional slide deck with real images, data charts, and unique design in under a minute.

Generate For Free

Myntra & North Retail IT Performance Report 2025

Explore IT operational excellence, service metrics, and automation initiatives for Myntra's North Retail region, featuring SLA and cost-saving highlights.

IT Initiatives & Performance Overview 2025

Myntra & North Retail Region | Operational Excellence Report

Performance Metrics Summary

• <b>10,582+</b> Service tickets managed with exceptional SLA adherence.<br>• <b>99.91%</b> Response Rate achieved across operations.<br>• <b>99.97%</b> Resolution Rate for critical IT support.<br>• <b>CSAT: 95.78</b> | <b>NPS: 94.74</b> indicating high user satisfaction.<br>• Guaranteed <b>100% Asset Availability</b> during Big Billion Days (BBD).

Ticket Volume by Center

Breakdown of 10,582 tickets managed across key fulfillment and distribution centers, highlighting the high volume at Bilaspur FC.

SLA Performance Dashboard

Bilaspur FC: 4,517 tickets with 100% Resolution SLA.

North DC Support: Perfect 100% score in both Response & Resolution.

Binola IT EUC: 99.89% consistent performance balance.

Automation & Network Enhancements

SCALABLE OPERATIONS:<br><br>• <b>LMC Automation</b> successfully enabled at Bilaspur & Binola locations.<br>• <b>Botify SSID</b> created significantly for automation tasks.<br>• Upgraded <b>180 Access Points</b> to ensure network resilience.<br>• Bandwidth capacity optimized based on deep-dive Ops consultations.

Asset Lifecycle Updates (2025)

Successful End-of-Life (EOL) replacements ensuring hardware reliability across the region.

₹15.5 Lakhs

generated in direct cost savings through proactive repairs and infrastructure optimization.

Workforce Empowerment

Massive scale training initiatives to ensure security and operational efficiency:<br><br><span style='font-size:1.5em; color:#bbd445;'>9,572</span> Operations Training Participants (303 Sessions)<br><span style='font-size:1.5em; color:#06BEE1;'>1,847</span> InfoSec Participants (46 Sessions)

Strategic Impact 2025

• Zero Business Disruption<br>• Chrome OS / Ubuntu Compliance: 80% achieved.<br>• Peak Performance: Scalability under pressure during EORS sales events.<br>• Team Morale: High CSAT/NPS scores reflecting a motivated workforce.

Thank You

North IT Region | 2025

  • it-performance
  • operational-excellence
  • retail-supply-chain
  • sla-report
  • warehouse-automation
  • business-analytics
  • it-metrics