Electrical Switching Safety: Protocols and PPE Guide
Essential safety protocols for electrical switching, covering accountability, pre-task assessments (JHA), and mandatory high-voltage PPE requirements.
Critical Protocol
Electrical Switching
Safety Procedures
Accountability, Pre-Task Assessment & PPE Requirements
TACORA
4.0
Who is Accountable?
The Superintendent is the person responsible for coordinating the actions of those who are preparing, checking, and executing a switch order.
5.0
Pre-Task Assessment
Why Perform a JHA Prior to Switching?
Ensure applicable permits are in place.
Review and discuss work permit, Isolation Checklist, Switching Order, and SLD with Tacora team and service provider.
Complete Take 5.
Do the walkdown with teams involved — familiarize with job scope and site.
Verify equipment used for switching is functionally tested; check for damage.
Ensure properly rated Arc Flash PPE and approved/calibrated High Voltage PPE are worn.
TACORA
Section 5.0
5.0 — Pre-Task Assessment
PPE Required for Switching Activities
Hot Gloves (26KV) — Class 3
Hot Stick + High Voltage Detector
(Verify clean, inspected and tested)
Arc Rating Level 1 Clothing (8–12 Cal)
Temporary Grounding Jumpers
Lockout Box / Isolation Sheet
⚠ All PPE must be approved, calibrated, and properly rated before use.