Luxury Spa & Pool Upgrade Proposal for Dunadry Hotel
Explore a comprehensive proposal for luxury aquatic enhancements, including stainless steel spa installation, pool retiling, and smart plant room automation.
SPA & POOL UPGRADE PROPOSAL
Dunadry Hotel — Luxury Aquatic Enhancement
Dunadry Hotel
The Pool Co Ltd
27 March 2026
QU-0056
thepoolcobelfast@outlook.com
QU-0056
01 / INTRODUCTION
About This Proposal
The Pool Co Ltd is pleased to present this proposal for the upgrade and enhancement of the spa and pool facilities at Dunadry Hotel. This document outlines the scope of work, specifications, and associated investment required to deliver a high-quality, modernised aquatic experience.
The Pool Co Ltd | thepoolcobelfast@outlook.com
QU-0056
02 / SCOPE OF WORKS
What's Included
Spa Installation
2.5m stainless steel octagon spa with body jets, underwater light, anti-slip steps & overflow channel
Pool Preparation
Tile removal, surface sanding & reskimming, waterproof coating application
Pool Retiling
Full retiling of pool surfaces with professional grouting for a high-quality finish
Plant Room Automation
Full automation with auto backwashing, remote control & integrated monitoring
Level Sensor Installation
Sensors on all spas across the hotel complex for consistent water levels
Pool Floor Raise
Raising of pool floor to meet updated operational and design requirements
QU-0056
The Pool Co Ltd | thepoolcobelfast@outlook.com
02.1 / SPA INSTALLATION
Stainless Steel Octagon Spa
2.5m stainless steel octagon spa
7 stainless steel body jets
1 underwater light
Anti-slip stainless steel steps
Overflow channel system
Premium stainless steel construction ensures durability, hygiene and a luxury aesthetic finish.
QU-0056
02.2 & 02.3 / POOL WORKS
Preparation & Retiling
Pool Preparation Works
Removal of existing pool tiles
Surface preparation: sanding & reskimming
Application of waterproof coating for durability
Pool Retiling
Full retiling of all pool surfaces
Professional grouting for high-quality finish
The Pool Co Ltd | thepoolcobelfast@outlook.com
QU-0056
02.4 & 02.5 / AUTOMATION
Smart Automation & Monitoring
Plant Room Automation
Full automation for both spa and main pool
Automatic backwashing system
Remote control functionality
Integrated pool monitoring system
Level Sensor Installation
Sensors installed on all spas in the main hotel complex
Ensures consistent water levels
Improved operational efficiency
Smart technology for effortless, efficient pool management.
The Pool Co Ltd | thepoolcobelfast@outlook.com
QU-0056
03 / INVESTMENT
Project Cost Summary
Description
Amount (GBP)
Spa Supply & Installation
£32,500.00
Pool Preparation Works
£7,100.00
Pool Retiling
£11,000.00
Plant Room Automation
£32,400.00
Level Sensor Installation
£2,300.00
Pool Floor Raise
£5,500.00
Subtotal
£90,800.00
VAT (20%)
£18,160.00
TOTAL INVESTMENT
£108,960.00
* All prices in GBP. VAT charged at standard rate of 20%. Quote Reference: QU-0056
The Pool Co Ltd | thepoolcobelfast@outlook.com
04 / PROJECT BENEFITS
Why This Investment Matters
🌟
Enhanced Guest Experience
A modern, luxurious spa facility that elevates the overall hotel experience and sets Dunadry apart as a premium destination.
⚙️
Operational Efficiency
Full automation reduces manual oversight, streamlines maintenance, and ensures optimal water quality at all times.
🔧
Durability & Reduced Costs
High-quality materials and waterproof coatings extend lifespan and significantly reduce long-term maintenance expenditure.
✨
Aesthetic Appeal
A beautifully retiled and modernised pool area creates a striking visual impression for guests and elevates the hotel's brand.
The Pool Co Ltd | thepoolcobelfast@outlook.com
QU-0056
Proposal Acceptance
Confirm in writing
Site Survey & Planning
Detailed schedule issued
Works Commence
Subject to site access
Project Completion
Handover & sign-off
A detailed project schedule will be provided upon approval. Timelines depend on site access and coordination with hotel operations.
This proposal is based on provided quote QU-0056
Any variations or additional works will be quoted separately
To proceed, please confirm acceptance in writing
thepoolcobelfast@outlook.com
The Pool Co Ltd | thepoolcobelfast@outlook.com
07 / ACCEPTANCE
Proposal Acceptance
Please sign below to confirm acceptance of this proposal
QU-0056
27 March 2026
We appreciate the opportunity to work with Dunadry Hotel and look forward to delivering a high-quality pool and spa upgrade.
The Pool Co Ltd | thepoolcobelfast@outlook.com
- pool-renovation
- spa-installation
- hotel-upgrades
- business-proposal
- aquatic-engineering
- smart-pool-technology