Construction Process: Risks & Mitigation PMP Framework
Master the 11-step pre-construction framework to manage risks, budgets, and schedules for predictable project outcomes. Includes a detailed case study.
Construction Process: Risks & Mitigation
PMP Framework: From Definition to Mobilization
The Framework Overview
A comprehensive pre-construction framework—from definition to scheduling—that minimizes risk and ensures predictable outcomes.
Step 1: Project Definition
Align business goals, scope, and budget before design starts. (Owner/PM)
Dixie Case Study: Success defined as a facility supporting long-term growth and optimized flow, not just minimum current demand.
Foundation: Due Diligence & Team Building
Step 2 - Due Diligence: Confirm site legal and physical viability.
Dixie: Verified zoning compliance and expansion capacity.
Step 3 - Build the Team: Assemble experienced consultants and partners.
Dixie: Engaged partners familiar with the operational model.
Step 4: Concept Budget & Schedule
Ambition meets reality. Validating scope delivery within approved limits.
Align scope, cost, and schedule.
Establish cost and timeline certainty early.
Dixie: Verified budget and schedule before design.
Design Evolution
Step 5: Schematic Design
Translating scope into a layout testing operations and cost. Dixie: Validated bay layouts and circulation.
Step 6: Design Development
Refining schematics into buildable systems (MEP). Dixie: Focused on hoist support and power.
Step 7 & 8: Documentation & Approvals
Step 7 - Construction Docs: Legal instructions. Detailed drawings/specs to minimize ambiguity.
Step 8 - Permits: Obtaining legal approvals. Dixie: Early coordination reduced review cycles.
Step 9: Pre-Construction Planning
Operational planning before site work. Includes logistics, sequencing, safety, and constructability.
Dixie Strategy: Efficient sequencing, detailed logistics, and safety controls.
Execution Readiness
Step 10: Procurement
Locking in cost and schedule. Ordering long-lead items early prevents delays.
Step 11: Pre-Start & Mobilization
Final readiness check including site, team, permits, and plans.
Common Delay Factors
Legal reviews and material supply chains are the top risks to manage early.
Strategic Mitigation
Early Flexibility & Strict Coordination
Cost Checkpoints & Early Procurement
Design Freeze Protocols
Detailed Pre-Construction Planning