# MH 2 Performance Overview: Logistics & Operational Growth
> Explore the MH 2 journey from April to December, featuring key metrics on logistics reliability, damage reduction, and IPP volume growth.

Tags: performance-analysis, logistics-strategy, operational-efficiency, data-visualization, business-metrics, supply-chain, project-management
## MH 2: The Journey from Start to End
- Strategic draft and operational evolution overview from April to December.

## Journey Overview
- Review of shifting operational targets, efficiency gains, and delivery reliability.

## NYR Reduction
- NYR metric improved from 2.1% (April) to 0.57% (December).
- Significant gains in process yield reliability.

## Logistics Reliability: OTD vs OTA
- On Time Delivery (OTD) increased from 82% to 94%.
- On Time Arrival (OTA) surged from 70.6% to 82%.

## Minimizing Damage Impact
- Damage rates reduced from 1.0% in April to 0.29% in December due to better handling protocols.

## IPP Volume Growth
- Processing capacity (IPP) scaled from 550 to 837 units.
- Represents a 52% increase in throughput and operational velocity.

## Quality Metric Analysis
- Quality Index shifted from 0.6% to 0.78%.
- Focus area: Balancing high volume with quality stability.

## The Strategic Shift
- Transitioned from a rigid monthly target system to a dynamic flow model.
- Results: Volume up 52%, damage down 70%.

## Forward Plan & Draft
- Target: Maintain >94% OTD reliability.
- Target: Keep damage rates below 0.30%.
- Goal: Scale IPP to 1000+ while stabilizing OTA.

## Conclusion: A Successful Pivot
- The project shows a strong trajectory for the next fiscal phase with a 12% improvement in OTD.
---
This presentation was created with [Bobr AI](https://bobr.ai) — an AI presentation generator.